Development and renovation of the club’s sports facilities.
Scope of Work:
- Construction of a regulation football field (artificial turf) – 8,000 m².
- Construction of an international athletics track (8 lanes – Tartan) around the football field.
- Washing and drainage networks for the track.
- 2,700 m² of metal fencing (3 m height).
- 1,200 linear meters of curbstones around fields and surrounding roads.
- 576 linear meters of drainage channels.
- 3,725 m² of interlock paving works.
- 9,500 m² of synthetic sports flooring (Tartan).
Electrical & Lighting Works:
- Supply and installation of 8 high-mast lighting poles (16 m).
- Supply and installation of 16 high-mast lighting poles (9 m).
- Supply and installation of 54 floodlights (2,000 W) for the main field.