Completion and development of the stadium master plan and construction of sports facilities.
Scope of Work:
- Construction of visitor and spectator entrance and exit gates.
- 220,000 m² of asphalt roads and parking areas.
- 35,000 m² of interlock roads and walkways.
- Supply and installation of sports field lighting systems in accordance with international standards.
- Supply and installation of a medium-voltage substation and 2,500 m of medium-voltage (XLPE) cables.
- Supply and installation of water supply and drainage networks totaling 8,800 m (diameters from 3” to 10”), including two pumping stations with full control systems.
- Supply and installation of 40,000 m of electrical cables and 600 lighting poles (heights ranging from 6 m to 28 m) for sports fields, football stadium, and roads.
- Supply and installation of 120 floodlights (2,000 W) for the auxiliary stadium.
Sports Facilities Constructed:
- 3 Tennis courts (Tartan surface)
- 3 Volleyball courts (Tartan surface)
- 2 Basketball courts (Tartan surface)
- 2 Football fields (Tartan surface)
3 Athletics tracks (Tartan surface)