Renovation and development of the hockey field.
Scope of Work:
- Construction of a 160 m³ water tank.
- Supply and installation of 2 pumps (75 HP).
- Advanced irrigation and washing systems for the entire field.
- Supply and installation of international-standard hockey turf flooring.