Construction of the University Sports City, including sports fields, grandstands, lighting, drainage, utilities, and surrounding roads.
Scope of Work:
- 80,000 m² of asphalt road works.
- Installation of an advanced irrigation system for the football field.
- Washing and drainage networks for all sports fields.
- Total reinforced concrete works: 5,300 m³.
- Main drainage and water supply networks totaling 7,000 m.
- Construction of public service facilities (11 public restrooms).
- Pumping station (2 × 75 HP) with filtration systems and a 260 m³ tank.
- Supply and installation of 4 lighting towers for the stadium in compliance with international standards.
- Construction of pedestrian bridges connecting the Sports City with student housing and the university (total length: 1,200 m).
Sports Facilities Constructed:
- 14 multi-purpose courts
- Football field (natural grass)
- Red clay tennis court with lighting and spectator stands
- 3 Handball courts (Tartan) with stands and lighting
- 3 Basketball courts (Tartan) with stands and lighting
- 3 Volleyball courts (Tartan) with stands and lighting
- Grandstands with a capacity of 8,000 spectators and a metal canopy
- International-standard athletics track (8 lanes)