Infrastructure works at New Adabiya Beach.
Scope of Work:
- Construction of a sewage pumping station.
- Construction of 2 athletics tracks.
- Roads and walkways for sports facilities.
- Construction of 2 international-standard football fields.
- Supply and installation of a water pumping station (¼ MW capacity).
- Total length of water supply and drainage networks: 6,000 m.
- Water supply and drainage networks with a lifting station (3 pumps × 75 HP) and a 250 m³ water tank.