Development and upgrading of Kafr El-Sheikh Sports Stadium.
Scope of Work:
- 1,500 m² of metal fencing.
- Relocation of the existing irrigation network to the auxiliary field.
- Construction of a regulation football field (natural grass) – 8,000 m².
- Washing and drainage networks for the athletics track.
- Covered irrigation and drainage networks for the football field.
- Construction of an international athletics track (8 lanes – Tartan).