Comprehensive Development and Rehabilitation Project, implemented in accordance with the plan of the Egyptian Ministry of Youth and Sports
Scope of Work:
- Design and construction of an irrigation water tank with a capacity of 100 m³ and pump room for the football field.
- Supply and execution of all mechanical work related to the pump room and tank.
- Excavation and leveling work include replacement and base layers.
- Installation of stormwater drainage networks and connection to the public network.
- Installation of subsurface drainage system for the football field according to international specifications.
- Installation of football field irrigation network using sprinkler cannons.
- Supply and installation of 4,700 m² metal fencing with a height of 6 meters.
Sports Facilities Constructed:
- Regulation-size natural grass football field.
- Multi-purpose court with soft acrylic flooring.
- Basketball court with soft acrylic flooring.
- Volleyball court with soft acrylic flooring.
- 2 Five-a-side football fields with artificial turf.
- Supply and installation of sports equipment for all facilities.